Search scope:
排序: Display mode:
China's High Dams Construction and Research on Science and Technology
Chen Zongliang
Strategic Study of CAE 2000, Volume 2, Issue 12, Pages 84-89
Keywords: hydroelectric power high dam gravity dam arch dam roller compacted concrete dam (RC-CD) concrete facerockfill dam (CFRD)
Challenges of high dam construction to computational mechanics
ZHANG Chuhan
Frontiers of Structural and Civil Engineering 2007, Volume 1, Issue 1, Pages 12-33 doi: 10.1007/s11709-007-0002-6
Keywords: reservoir engineering hydro-power development state-of-the-art computational earthquake
Numerical simulation of damage in high arch dam due to earthquake
Hong ZHONG , Gao LIN , Hongjun LI
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 3, Pages 316-322 doi: 10.1007/s11709-009-0039-9
Keywords: mesoscopic heterogeneity damage simulation in earthquakes arch dam
Key Technical Issues Related to Super-high Concrete Slab Dam
Ma Hongqi,Cao Keming
Strategic Study of CAE 2007, Volume 9, Issue 11, Pages 4-10
Keywords: concrete slab dam super-high dam technology
Effect of Perimeter Joint on the Performance of Xiaowan High Arch Dam
Du Chengbin,Ren Qingwen
Strategic Study of CAE 2000, Volume 2, Issue 9, Pages 70-75
The nonlinear effect of perimeter joint on the performance of Xiao Wan high arch dam (292.0m high)Variation of the stress and displacement at the key location of the arch dam with perimeter joint onCrack and yield near dam heel with or without joint are studied, The result of analysis demonstratesnear dam heel with joint has a great improvement ,while little difference of stress and displacementoccurs on the other location of the dam.
Keywords: perimeter joint nonlinear FEM Xiaowan high arch dam crack yield
Cui Bo,Hu Lianxing,Liu Donghai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 91-96
In this paper, on the basis of research on high core rock-fill dam fillingmonitoring is determined; the solution scheme is proposed; the monitoring system of core rock-fill damfilling construction process, with the characteristics of real-time, high precision, automation andon dam surface.The monitoring system is applied in the construction field of the highest earth rock-fill dam in Asia
Keywords: high core rock-fill dam filling construction process real-time monitoring transportation to dam rollingon dam surface development and application
Theory and application of system integration in real-time control on high arch dam construction
Ren Bingyu,Wu Binping
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 84-90
Keywords: real-time control system integration data integration network platform high arch dam construction
Theory and application of construction simulation for roller compaction of high core rock-fill dam
Zhong Denghua,Zhao Chensheng,Zhang Ping
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 28-32
Based on the overall analysis of roller compaction system of high corerock-fill dam, the theory of construction simulation for roller compaction is put forward and the simulationmodel is set up which can actually reflect the uncertainties of the rock-fill dam roller compactionThis study achievement has been applied to the filling unit construction process of the Nuozhadu highcore rock-fill dam to verify the reliability of the simulation model, which gives important guidance
Keywords: high core rock-fill dam roller compaction construction simulation
Key Technologies in the Design and Construction of 300 m Ultra-High Arch Dams
Renkun Wang
Engineering 2016, Volume 2, Issue 3, Pages 350-359 doi: 10.1016/J.ENG.2016.03.012
Starting with the Ertan arch dam (240 m high, 3300 MW) in 2000, China successfully built a total ofseven ultra-high arch dams over 200 m tall by the end of 2014.high water pressures, high seismic design criteria, and complex geological conditions.m ultra-high arch dams, including the strength and stability of foundation rock, excavation of the dambase and surface treatment, dam shape optimization, safety design guidelines, seismic analysis and design
Keywords: Ultra-high arch dam Shape optimization Arch dam overall safety Seismic safety Concrete temperature control
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 20-27
Keywords: high core rock-fill dam high concrete dam construction quality construction schedule real-time monitoring digital dam
Confining pressure effect on dynamic response of high rockfill dam
Xuexing CAO, Yunlong HE, Kun XIONG,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 116-126 doi: 10.1007/s11709-010-0014-5
Keywords: confining pressure effect high rockfill dam dynamic response Hardin-Drnevich constitutive model
Intelligent compaction theory of high roller compacted concrete dam
Liu Donghai,Li Bingyang,Cui Bo
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 74-79
Keywords: roller compacted concrete(RCC)dam quality control intelligent compaction real-time monitoring real-time
Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland
M. WIELAND, G.F. KIRCHEN
Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 1, Pages 76-83 doi: 10.1007/s11709-012-0144-z
Keywords: dam safety concept arch dam dam instrumentation dam safety monitoring
Technical Progress on Researches for the Safety of High Concrete-Faced Rockfill Dams
Hongqi Ma,Fudong Chi
Engineering 2016, Volume 2, Issue 3, Pages 332-339 doi: 10.1016/J.ENG.2016.03.010
The concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dams to bem ultra-high CFRDs.m ultra-high CFRDs, and suggests focuses and general ideas for future research.
Keywords: High concrete-faced rockfill dam Safety Technical progress
Features of seismic hazard in large dam projects and strong motion monitoring of large dams
Martin WIELAND,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 56-64 doi: 10.1007/s11709-010-0005-6
Keywords: seismic hazard arch dam concrete face rockfill dam strong motion instrumentation reservoir-triggered
Title Author Date Type Operation
China's High Dams Construction and Research on Science and Technology
Chen Zongliang
Journal Article
Numerical simulation of damage in high arch dam due to earthquake
Hong ZHONG , Gao LIN , Hongjun LI
Journal Article
Effect of Perimeter Joint on the Performance of Xiaowan High Arch Dam
Du Chengbin,Ren Qingwen
Journal Article
Development and application of the real-time monitoring system for filling construction process of highcore rock-fill dam
Cui Bo,Hu Lianxing,Liu Donghai
Journal Article
Theory and application of system integration in real-time control on high arch dam construction
Ren Bingyu,Wu Binping
Journal Article
Theory and application of construction simulation for roller compaction of high core rock-fill dam
Zhong Denghua,Zhao Chensheng,Zhang Ping
Journal Article
Key Technologies in the Design and Construction of 300 m Ultra-High Arch Dams
Renkun Wang
Journal Article
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Journal Article
Confining pressure effect on dynamic response of high rockfill dam
Xuexing CAO, Yunlong HE, Kun XIONG,
Journal Article
Intelligent compaction theory of high roller compacted concrete dam
Liu Donghai,Li Bingyang,Cui Bo
Journal Article
Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland
M. WIELAND, G.F. KIRCHEN
Journal Article
Technical Progress on Researches for the Safety of High Concrete-Faced Rockfill Dams
Hongqi Ma,Fudong Chi
Journal Article